Hot water air cooling unit in a first zone of the LDPE reactor
Development: September 2022 – November 2022 Implementation: June 2023
Facility description: A hot water air cooling unit control system for a first zone of the ethylene polymerization reactor. Integration into the existing APCS.
Works performed:
Inspection of the facility, collection of initial data
Development of design and detail design documentation for the APCS according to the requirements specifications
Development of application software for PLC and SCADA
Installation, start-up and adjustment
Personnel training on the system operation
Putting into trial operation
Elimination of identified deficiencies
Putting into commercial operation
Hardware and software main specifications:
Upper level: SCADA system WinCC
Lower level: ABAK-K2 and SIMATIC S7-417H controllers.
Industrial Ethernet field bus.
Data exchange with a local control system via Modbus RTU protocol.
Project features:
— Works at a hazardous production facility were performed while the existing equipment was in operation. — Integration of the existing APCS based on the SIEMENS controllers with a new air cooling unit control subsystem. — Precise process control with the use of frequency converters. — Data transmission to the enterprise’s MES.